BKK five-story condo MEP renovation
The BKK five-story condominium renovation project in Sukhumvit, Bangkok, focuses on upgrading the main engineering networks, including plumbing, electrical supply, HVAC systems, and elevators. The renovation will address discrepancies in existing systems as noted in the MEP specifications, with a timeline of 6 months for completion. The scope includes modernizing the water supply and sewage systems, removing old fixtures, and replacing pool equipment, all utilizing modern and long-lasting materials. Additionally, all old CDU units will be replaced with Hisense suppliers to enhance efficiency. The old Cone lifts will be replaced with Shindler lifts to improve functionality and safety. All materials will be the contractor's responsibility and expense, with the total area for renovation calculated based on the provided floor plan, which includes labeled dimensions for various rooms.
Scope of works
- plumbing
- electrical
- hvac
- demolition
This project has already been awarded — details are visible to the client and the awarded contractor only.