Scope
Turnkey BOH fit-out incl. kitchen replacement, MEP, and wet-area finishes.
Comment
Night-work plan included. Owner-supplied kitchen equipment excluded.
Grand total (incl. VAT)
- Works total (THB)THB 2,900,000
- Preliminary (5%)THB 145,000
- Overhead & profit (10%)THB 290,000
- VAT (7%)THB 227,500
- Grand total (incl. VAT)THB 3,250,000
Cost breakdown
- DemolitionTHB 180,000
- TilingFloor & wet areasTHB 420,000
- JoineryTHB 680,000
- MEPTHB 520,000